| _ |
|
 |
|
| _ |
|
|
| Description: Single storey school development by Kier London. Framed from structural steelwork and Glulam Timber local to the sports hall and swimming pool |
| |
|
| Statistics: 111 Tonne hot-rolled structural steelwork. 20 M/cube Glulam Timber. 1.5 Tonne Metsec purlins/rails. |
|
| |
|
|
 |
| Copyright © 2011 Matrix Cad Ltd: All content of this site is property of the acknowledged owners |
|
|
| Office 6, Curzon House, Curzon Street, Burton Upon Trent, Staffordshire, DE14 2DH |
|
|